Hospitality procurement from
concept to completion

Blue Moon is a London-based specialist hotel procurement company built around Gordon Anderson’s previous 25+ previous years of global hospitality, construction and operations experience.

About us

From specification to installation, we offer efficient, communicative and transparent procurement services that are both competitive and ethically responsible.

In new build or refurbishment programmes for international brands or entrepreneurial independents, our purpose is to protect the design intent while also protecting the client’s budget.

Expertly sourced
fixtures, fittings & equipment

Our specifications knowledge is vast, our understanding of sustainable quality is inherent, and our honed global supplier network is one of our unique strengths.

We believe in collaborating early in the process, at all levels, and with all members of the design team. This is how we create solid foundations that will support and inform the project through to completion.

Proactively planned
operating supplies & equipment

As a hotel project develops, the needs of each department will naturally present themselves. But we believe in assessing, identifying and specifying requirements from the outset.

We do this by working closely with the appointed GM and heads of department to approach the project from a holistic point of view. Giving clients early indicators of requirements, along with a detailed projection on associated costs and lead-times, enables the project to maintain its flow and complete on schedule.

Projects











Royal Automobile Club, Pall Mall
108 Guestroom refurbishment of 5 * Private Members Royal Automobile Club, in the famous Clubland area of London. Scope includes FF&E and OS&E for Guestrooms and Corridors spaces.
Client: Royal Automobile Club

Interior Design: Goddard Littlefair
Brand: Independent
Phased Open: Q4 2023 & Q4 2024



The Belfry Golf Hotel & Resort
319 Guestroom refurbishment, alongside 149 new build guestroom extension at the 4 * The Belfry Golf Hotel & Resort, located in North Warwickshire. Scope includes FF&E and OS&E for Guestrooms, Corridors & Public Areas including Events Ballroom, Spa and 7 F&B outlets with individual identify.
Client: Cedar Capital

Interior Design: Fusion Interiors Group
Brand: Independent
Phased Open: Early 2024



Westin London
250 Guestrooms Westin Hotel with stunning public areas overlooking the River Thames. Scope includes all Guestrooms, Corridors, Public Areas and OS&E. A further 5 Services Apartments were added to the FF&E scope.

Client: 4C Hotel Group
Interior Design: Dexter Moren Associates
Brand: Westin
Hotel Open Q4 2021, Further Serviced Apartments Open Q2 2023

Whiteleys Six Senses, London
Redevelopment of an iconic London landmark from a Grade II listed shopping centre into part residential and 100 guestroom hotel. Scope includes FF&E and OS&E for Guestrooms, Corridors & Public Areas within the hotel. In addition we have managed the purchase of the FF&E + OS&E of x5 Serviced Apartments and the Estate Management OS&E.

Client: Finchatton
Interior Design: Avroko
Brand: Six Senses
Open: Q2 2024


Canopy By Hilton, London
320 Guestrooms Canopy by Hilton. Scope includes model room, Guestrooms, Corridors, Public & BOH Areas. 2 Model Rooms completed Late 2021.

Client: 4C Hotel Group
Interior Design: Acme
Brand: Canopy by Hilton
Virgin Hotel, Edinburgh

220 Guestroom 5 * development located in the landmark India Buildings in the heart of Edinburgh’s Old Town, close to The Royal Mile. Scope includes Guestrooms, Corridors and Public Areas including multiple F&B outlets as well as the brand’s flagship Commons Club Bar.

Client: Flemyn
Interior Design: ICA
Brand: Virgin Hotels
Open: Summer 2022


Hotel Indigo Bath
166 Guestrooms Hotel Indigo Bath.
Scope includes Guestrooms , Corridors, Public & BOH areas.
Opening Autumn 2019.

Client: St James Hotels Developments
Interior Design: ACT Architects
Brand: IHG
W Hotel Leicester Square, London
192 Guestrooms refurbishment. Three Model Rooms completed Autumn 2018. Refurbishment completed Mid 2019.

Client: W Hotel
Interior Design: Concrete/Krause Architects
Brand: Marriott
Adina Group, Germany

Adina Frankfurt 180 Apartment Rooms – opened November 2016

Adina Nurnberg 140 Apartment Rooms – opened October 2016

Adina Hamburg 220 Apartment Rooms – opened December 2017

Adina Leipzig 166 Apartment Rooms - opened December 2017

Adina Copenhagen 128 Apartment Rooms refurbishment – completed February 2018

Adina Freiburg 117 Apartment Rooms - opening July 2021

Interior Design: SJB Australia
Scope: Model Rooms and all Hotel FF&E

Adina Munich 234 Apartment Rooms - opening August 2020

Adina Cologne 166 Apartment Rooms - opening June 2020

Adina Dusseldorf 201 Apartment Rooms - opening April 2020

Weisbden - opening 2020

Stuttgart - opening 2021

Interior Design: AFK
Scope: Model Rooms and all Hotel FF&E
Adina Group, Germany

Adina Frankfurt 180 Apartment Rooms – opened November 2016

Adina Nurnberg 140 Apartment Rooms – opened October 2016

Adina Hamburg 220 Apartment Rooms – opened December 2017

Adina Leipzig 166 Apartment Rooms - opened December 2017

Adina Copenhagen 128 Apartment Rooms refurbishment – completed February 2018

Adina Freiburg 117 Apartment Rooms - opening July 2021

Interior Design: SJB Australia
Scope: Model Rooms and all Hotel FF&E
 

Adina Munich 234 Apartment Rooms - opening August 2020

Adina Cologne 166 Apartment Rooms - opening June 2020

Adina Dusseldorf 201 Apartment Rooms - opening April 2020

Weisbden - opening 2020

Stuttgart - opening 2021

Interior Design: AFK
Scope: Model Rooms and all Hotel FF&E
The Elder, Bath

Restaurant joint venture with Executive Chef Mike Robinson
70 covers plus outdoor terrace
Opening Autumn 2019

Client: St James Hotels Developments
Designer: Fettle




Kempinski Vier Jahreszeiten, Munich

Restaurant & Bar refurbishment.
250 covers across two private dining areas, two bars plus wine bar, restaurant & outdoor terrace.
Relaunching July 2019
Client: Kempinski
Designer: FG Stijl





Highgate Hotels - Refurbishment Programme

K+K George London
2 Model Guestrooms - November 2016
154 Guestroom refurbishment completed Q2 2018

K+K Cayré Paris
125 Guestrooms refurbishment completed Summer 2018

K+K Fenix Prague
Model Rooms - January 2017
128 Guestrooms refurbishment completed Winter 2018

K+K Opera Budapest
42 Guestrooms refurbishment completed Summer 2018

Interior Design: Design Agency

Gates Barcelona
240 Guestrooms, Public Area, Meeting Room and Rooftop area completed Winter 2018
Interior Design: Brime Robbins/Carmen Koller

Highgate Hotels - Refurbishment Programme

K+K George London
2 Model Guestrooms - November 2016
154 Guestroom refurbishment completed Q2 2018

K+K Cayré Paris
125 Guestrooms refurbishmen completed Summer 2018

K+K Fenix Prague
Model Rooms - January 2017
128 Guestrooms refurbishment completed Winter 2018

K+K Opera Budapest
42 Guestrooms refurbishment completed Summer 2018

Interior Design: Design Agency
 

Gates Barcelona
240 Guestrooms, Public Area, Meeting Room and Rooftop
area completed Winter 2018
Interior Design: Brime Robbins/Carmen Koller
The Hoxton Holborn

54 Guestroom extension
Scope includes Guestrooms & Corridor areas
Model Room completed March 2019
Opening Q4 2019

Client & Designer: Ennismore




Vintry & Mercer
92 Guestrooms Boutique Hotel close to St. Paul’s Cathedral.
2 model rooms completed and approved in April 2016.
Opened February 2019.

Client: FR Holdings
Interior Design: DMAi


Ambassadors, Bloomsbury
4* 100 guestroom 19th Century hotel in a prime position located 5 minute walk from Euston train station. Scope includes FF&E and OS&E for Guestrooms, Corridors & Public Areas.
Client: Guidezone Ltd T/A Ambassadors Bloomsbury

Interior Design: ICA
Brand: Independent
Open: End of 2024



Great John Street, Manchester
Original Victorian school house, transformed into a 21 guestroom boutique townhouse hotel. Scope includes FF&E for Guestrooms, Corridors & Public Areas including rooftop.

Client: The Hut Group
Interior Design: EPR
Brand: Independent
Open: End 2025


Hilton London Metropole
Description: 583 Guestroom 4* hotel refurbishment, 15-minute walk from Oxford Street, and just 650 yards from Paddington Station. Multi cuisine restaurants and spa areas. Scope includes FF&E and OS&E for Guestrooms, Corridors & Public Areas.

Client: John Rowan & Partners
Interior Design: Perkins + Will London
Brand: Hilton
Open: Early 2022


Marine Hotel, North Berwick
84 Guestroom refurbishment of an existing category B listed hotel & spa in Scotland. Selected rooms boast stunning scenic views of the West Links golf course, firth of fourth estuary and islands. Scope includes FF&E and OS&E for Guestrooms, Corridors & Public Areas.

Client: AJ Capital, Chicago
Interior Design AJ Capital, Chicago
Brand: Independent
Open: Late 2021


The Hoxton, Barcelona
240 Guestrooms 4 * refurbishment located in the Poblenou neighbourhood, just a 20 minute from the famous Sagrada Familia and the beach. Scope includes Guestrooms, Corridors and Public Areas, including meeting rooms, outside terrace & rooftop swimming pool.

Client: Ennismore
Interior Design: Ennismore Design Studio
Brand: The Hoxton
Open: Early 2022


The Hoxton, Edinburgh
212 Guestroom 4* Hoxton Hotel Refurbishment in historic townhouses, 10-minute walk to the Edinburgh old town quarter. Scope includes FF&E and OS&E for Guestrooms, Corridors, Public Areas & BOH.

Client: Cedar Capital
Interior Design: Ennismore Design Studio
Brand: The Hoxton
Open: Q1 2024


The Hoxton, Shepherds Bush
237 Guestrooms 4* Hoxton Hotel new build development directly on the well connected Shepherds Bush green, 20-minute tube journey to Oxford Circus. Scope includes FF&E and OS&E for Guestrooms, Corridors, & Public Areas.

Client: Ennismore
Interior Design: Ennismore Design Studio
Brand: The Hoxton
Open: Late 2022


The Hoxton, Vienna
196 Guestrooms 4* Hoxton Hotel Refurbishment of a commercial building design by acclaimed Austrian architect Carl Appel in the 1950s. Scope includes FF&E, OS&E for Guestrooms, Corridors, & Public Areas including coffee shop, restaurant, meeting spaces, auditorium, basement bar & roof terrace with swimming pool.

Client: Ennismore
Interior Design: Ennismore Design Studio
Brand: The Hoxton
Open: Q1 2024


Tribe, Canary Wharf
New build 312 guestroom hotel within the brands lifestyle portfolio and new development within the Canary Wharf sector. Scope includes FF&E and OS&E for Guestrooms, Corridors & Public Areas.

Client: Canary Wharf Contractors
Interior Design: Ennismore
Brand: Accor, Tribe
Open: Summer 2022


Corsham Street, London
78 Guestroom new build development of a new-to-market brand in Shoreditch. Scope includes FF&E and OS&E for Guestrooms, Corridors, & Public Areas including lobby, restaurant, basement bar, private members, co-working place, gym & studio spaces.

Client: Cedar Capital
Operator: White Rabbit Project
Interior Design: SODA Studio
Brand: TBC
Open: Early 2024


The Newman, Fitzrovia
86 Guestrooms new build development of a 5 * plus new-to-market brand within the heart of Fitzrovia, London. MUR budget exercise and tendering key packages for client and project team across Guestrooms, Corridors & Public Areas which includes lobby, restaurant, basement bar and spa.

Client: FHHB Hospitality
Interior Design: Lind + Almond
Brand: Independent



Bedford Place, London
43 Guestroom hotel, with public area & outdoor space. Scope includes FF&E and OS&E for all areas.

Client: SAV Group
Interior Design: Studio Moren
Open: Q4 2024



More House, London
115 Room High end student accommodation with public areas and communal study spaces. Scope includes FF&E and OS&E for all areas.

Client: SAV Group
Interior Design: Studio Moren
Open: Q4 2024



Non-Disclose Private Members Bar & Spa
Private Member’s Bar & Spa extension to an existing 5 * independent hotel within Central London. Scope includes FF&E and OS&E.

Client: Private
Interior Design: Non-Disclose
Brand: Independent
Open: Q2 2024


Non-Disclose Aparthotel
Portugal, Refurbishment in a former palace, comprised of x88 guestrooms with Public Restaurant, Bar & Spa Areas.

Client: The July
Interior Design: Non-Disclose
Open: Q1 2027


Non-Disclose Hotel Branded Serviced Apartments
Dubai, New Build 380 Apartments comprised of 3-4 Bedrooms including lobby spaces, Restaurant, Bar & Outdoor Pool Areas.

Client: Private
Interior Design: Non-Disclose
Open: Q1 2025


Dorsett London City
Description: Reception Lobby, Restaurant & Bar refurbishment. Scope includes FF&E for 60 restaurant covers & 30 bar covers across ground floor and rooftop levels.

Client: Highgate
Operator: White Rabbit Projects
Interior Design: Child Studio
Open: Autumn 2023


PREVIOUS PROJECT
NEXT PROJECT

Model Rooms
vision made real

Realising the combined vision of our clients and their designers is our priority. So much goes into the design process that we make sure everything we do embraces, supports and embeds it.

To demonstrate our understanding and bring the vision alive for client approval before rollout, we are equipped to take full responsibility for delivering detailed model rooms either on or off-site.

Tried and tested
working practices

Because we understand the importance of clarity, fluidity and accuracy, we operate on a fixed-fee basis. Agreeing our fees at the outset of the project, based on the level of involvement required, enables our clients to budget accurately for the other parts of their big picture.

We manage the procurement function by setting up individual bank accounts to hold client funds. These funds are held in trust, with all purchase orders signed by our client on provision, by us, of full documentation to support the decision. Payments are only made to suppliers after client approval.

Monthly reporting, including bank reconciliations, ensures full transparency at all times. This proven process keeps things moving in the right direction, and at the correct pace, throughout the project.

Alternatively, we can operate a system whereby our client raises all purchase orders and pays all suppliers directly. Our ability to be flexible is another of our unique strengths.

Well placed to provide
other services

We are primed to assist with requirements beyond our core procurement role. Our
position within the project team, coupled with our unrivalled professional connections,
makes us the ideal partner for management of many supporting services:

  • Signage
  • Printing
  • Standardising operating procedures
  • F&B strategy
  • Tabletop design and presentation
  • Menu development
  • Branding and logo design
  • Website development

The Team
















Contact

hello